Cable Protection System

Client
Nordex
Work category

Background

i4pd were asked to develop a solution to reduce downtime and improve cable maintenance in the turbine yaw room.

Nordex Cable Protection System
Nordex Cable Protection System

Approach

We researched the client's 3 main turbine series, measuring critical dimensions and evaluating accessibility for any new components to be fitted in this environment, including transportation to the top of the tower in lifts. Ideas were generated through discussion and sketching and further developments in CAD. Key to the performance was selection of appropriate materials. 

Result

i4pd coordinated tooling and procurement and supplied boxed kits, including installation manuals to over 30 wind farm sites across the UK and Europe. Two of our very brave staff held the necessary climbing at heights certifications.

Nordex Cable Protection System
Nordex Cable Protection System

We like to find new, better and efficient ways of doing things. Contact us to discover how i4 Product Design can solve your current design challenge and take your product to the next level.

Schedule a call today

It all starts with a conversation.
Let's make something amazing together.

We'd love to hear from you.
Book a Meeting

Leverage our #DesignInsights to shape your development.

Subscribe for our webinars, articles and reports.
Subscribe Now
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram